Level the subgrade, unroll the canvas along water flow, anchor in trenches, then saturate with water. Initial set in 2 hours, 80% strength in 24 hours — about 10× faster than poured concrete.
HENGYANG NEW MATERIALSGeomembrane | Geotextile | GCL Manufacturer
Level the subgrade, unroll the canvas along water flow, anchor in trenches, then saturate with water. Initial set in 2 hours, 80% strength in 24 hours — about 10× faster than poured concrete.
Factory direct · Global shipping